U gebruikt een verouderde browser, Internet Explorer wordt niet meer ondersteund door Microsoft. Wij adviseren het gebruik van Google Chrome.

OCS Energiezuil voor buitengebruik

OCS Energy pillar for outdoor use

 The ES energy pillars can be designed to suit your needs. On behalf of the DIN VDE 0100-708 part 7-708 criterion, all camping sites and marinas must meet the following requirements:

  • Every camp site or berth must be equipped with a universal CEE connection norm– IEC/EN60309.
  • The 230V connection must be suitable for at least 16A but every 230V connection must also to be secured with a fuse / ground fault of up to 30 mA.
  • The 230V connection must to be installed a minimum height of 0,5 metres and a maximum of 1,5 metres above ground level.
  • Only 4 connections ( 3/16A – 230V) are allowed per energy pillar.
  • The maximum distance allowed between campsite to the energy pillar is 20 metres.
  • The camper or the yacht owner must use an extension lead with the H07RN-F 3G2,5 specification and the cord should be no longer then 25 metres.

The energy pillar is manufactured in Germany.

Vergelijk
Category:

Product description

Water resistance 

IP class: IP54, (suitable for wet cultivated rooms).

Conductor ports

Through the bottom side of the pillar.

Material

Stainless steel

Colour

stainless steel – pearl brushed
Other RAL colours on request.

Measures

Depending  on the structure – measures vary from Ø 140 x 700 mm to Ø 254 x 1000 mm.

Extra information

Kleur

Metaalkleur

IP-klasse

IP55

Type unit

Opbouw

Doorvoer

Vloer

Grootte

3-voudig, 4-voudig, 6-voudig, 7-voudig, 8-voudig

Aansluitingen

1x230V, 1xCAI, 1xDVI, 1xHDMI, 1xKabeldoorvoer, 1xVGA, 1xXLR, 2xAudio, 2xTulp, 2xUSB, 2xUTP/STP, CEE FORM

Vloertype

Stortvloer

Materiaal

Article numbers

(Nederlands)

UitvoeringArtikelnummer
2 x 230V + 2 x CEE 5/16A – 400V77.77.082
4 x CEE 3/16A/230V + 1 x CEE5/16A 400V77.77.083

Other versions available on request.

Download leaflets and manuals

Vanwege Hemelvaartsdag zijn wij gesloten op donderdag 30 en vrijdag 31 mei.

Maandag 3 juni staan we weer voor u klaar. Alvast een fijn weekend!